The dental clinics complex at Suez Canal University

Project Synopsis

1.    Revit Modelling LOD 400 2.    Zero Clash Shop Drawings

Project Objective

This project has been studied by Egy house through its BIM workflow before starting the construction process and it has improved the construction process efficiency and time management through the robust clash detection and BIM 4D and 5D simulations.

Project Summary

This project is a new clinics complex in the Suez Canal University compass.

Disciplines

1.     HVAC (DX air handling unit system) 2.     Fire Fighting systems (Water based). 3.     Electrical systems (Power and Lighting systems) 4.     Plumbing systems (Water Supply and Sanitary Drainage) 5.     Structural systems (Flat slab system). 6.     Architectural and interior shop drawings.

Type Of Building: Medical building.

BIM LOD: 400

Unit of measurement: mm (SI units)

Project Deliverables

1.     MEP Revit Model (.rvt file) 2.     Architectural and structural Revit Model (.rvt file) 3.     All The mentioned disciplines Shop Drawings (DWG/PDF format).