The intensive care expansion in Suez Canal University hospital
Project Synopsis
1. Revit Modelling LOD400
2. Zero Clash Shop Drawings
Project Objective
Our scope included design and zero clash shop drawing for all the MEP, architectural and structural systems and extracting 2D documentation from the 3D Model.
Project Summary
The very special project in Suez Canal University was launched after the COVID-19 to increase the hospitability capacity.
Disciplines
1. HVAC (DX air handling unit system)
2. Fire Fighting systems (Water based and clean agent systems).
3. Electrical systems (Power and Lighting systems)
4. Light current systems (nurse calling and fire alarm systems).
5. Plumbing systems (Water Supply and Sanitary Drainage).
6. Architectural detailing and family creation.
7. Structural shop drawings
Type Of Building: Medical building.
BIM LOD: 400
Project budget: 100,000,000 EGP
Unit of measurement: mm (SI units)
Project Deliverables
1. MEP Revit Model (.rvt file)
2. Architectural and structural Revit Model (.rvt file)
3. All The mentioned disciplines Shop Drawings (DWG/PDF format).
Validation authority
The international designer engineering consultant and project management.
Validation cycle
The average submission to approval period is nine working days within which online meetings are held with the validating authority the discuss all technical issues for the approval.